The framing, electical, spray insulation, drywall, and painting was all done the first year. Last year we did the dricore (subfloor tiles on concrete basement walkout and a floating tile floor on top). We never got around to doing the door frames and baseboards. Those were supposed to get done this year, of course it is now the middle of November and we are racing to finish everything before the end of the year. Here is a photo showing the moulding I selected to go around the door frames in the laundry room and the outside patio door. I take some photos tomorrow of Frodo's area, and the door frames in the daylight.
Showing posts with label Frodo. Show all posts
Showing posts with label Frodo. Show all posts
Saturday, 22 November 2014
Door frames
No stitching again today, busy doing grocery shopping. Then decided to add the trim in our basement patio door. We started our walkout basement renovations 2 years ago. The basement has the laundry room, and L shaped family room. We didn't put in a bathroom because we used the space for an indoor turtle pond for our family pet. We have a female Red-Eared Slider turtle named Frodo.
Saturday, 3 November 2012
3rd day
I'm on the 3rd day of November and I have already ran out of things to blog about because I usually only talk about my stitching.
Here is a photo of Frodo. She is a Red-eared slider (turtle). She will be 7 on December 31st (that was the day we bought her). She likes to stand on her hind legs and stick her nose out of the water to be petted. We usually rub the top of her nose, she seems to like it.

- Posted using BlogPress from my iPad
Here is a photo of Frodo. She is a Red-eared slider (turtle). She will be 7 on December 31st (that was the day we bought her). She likes to stand on her hind legs and stick her nose out of the water to be petted. We usually rub the top of her nose, she seems to like it.
- Posted using BlogPress from my iPad
Subscribe to:
Posts (Atom)

